Skip to content
Costing

Commercial Kitchen Equipment Price Guide

What a commercial kitchen actually costs to equip, broken down by category, with the variables that move the number most.

Reading time
9 minutes
Last updated
14 July 2026
Technical drawings, a scale rule and pencils laid out for costing work

Kitchen equipment budgets go wrong in a predictable way: the fabricated scope is estimated from a per-square-foot rule of thumb, the bought-out equipment is priced from a brochure, and the utilities, ventilation and installation are left out entirely. The result is a number that is usually thirty to forty per cent short.

This guide breaks the cost into the categories that actually appear on an invoice and explains what moves each one. All ranges are indicative and vary by specification, grade, city and project size.

What makes up a commercial kitchen budget

A commercial kitchen budget has five components, and only the first two are what most people mean when they say "equipment".

  • Fabricated stainless-steel scope — work tables, sinks, racking, counters, hoods
  • Bought-out equipment — ranges, ovens, refrigeration, dishwashers, small equipment
  • Ventilation and ducting — hoods, ducting, fans, fresh-air make-up
  • Utilities — gas pipeline, electrical distribution, plumbing and drainage
  • Installation, commissioning and freight

Indicative cost ranges by category

The table below gives broad ranges for the fabricated scope. Bought-out equipment varies far more, because a range can cost anything from a modest figure to several times that depending on brand and specification.

CategoryIndicative rangeMain cost driver
Work tables and benching₹ 8,000 – ₹ 25,000 per unitLength, sheet gauge, sink integration
Sinks and wash-up lines₹ 15,000 – ₹ 60,000 per lineBowl count, drain board length, grade
Storage racking₹ 6,000 – ₹ 20,000 per bayShelf type, load rating, cold-room spec
Exhaust hood and ducting₹ 1,200 – ₹ 3,000 per sq ftFiltration type, duct run length, fan
Cooking range₹ 25,000 – ₹ 2,00,000Burner count, HP/LP, oven base
Refrigeration (per unit)₹ 45,000 – ₹ 2,50,000Capacity, doors, ambient rating
Display counter₹ 40,000 – ₹ 1,80,000Length, glass profile, refrigeration

The five variables that move the number most

Two kitchens of identical size can differ by fifty per cent in equipment cost. These are the reasons, roughly in order of impact.

1. Steel grade and sheet thickness

SS 202 is meaningfully cheaper than SS 304 and looks nearly identical on day one. It also corrodes in a wet kitchen. Sheet thickness matters as much: a 0.8 mm top and a 1.2 mm top are different products at different prices, and only one of them survives a chopping board.

2. Menu and cooking method

A tandoor-and-curry menu needs high-pressure burners and heavy extraction. A sandwich-and-salad menu needs refrigerated assembly and almost no cooking. The same floor area produces completely different equipment schedules.

3. Refrigeration ambient rating

A unit rated for 32°C ambient costs less than one rated for 43°C. In most Indian kitchens the cheaper unit will struggle every summer, run continuously and fail early. This is the single most common false economy in kitchen procurement.

4. Ventilation

Ventilation is routinely under-budgeted because the hood is visible and the ducting is not. On a mall or high-rise site with a long duct run and mandated filtration, ventilation can approach the cost of the cooking equipment itself.

5. Site condition

A shell that needs floor levelling, drainage falls cut, gas routed from a distant bank and power upgraded will add substantially to a budget that only counted equipment.

How to build a budget that holds

Start from the menu and the cover count, not from the floor area. Get the equipment schedule agreed before pricing anything, because a schedule can be priced accurately and a floor area cannot.

Then price the five components separately, add a contingency of ten to fifteen per cent for site conditions, and confirm what is excluded — freight, unloading, statutory approvals and civil work are the usual omissions.

Frequently asked questions

For a 40 to 60 cover restaurant, the fabricated scope plus basic bought-out equipment typically lands in a mid six-figure range, before ventilation and utilities. The figure moves substantially with cuisine and specification. [Replace with your own verified range]

More guides

Related reading

Kitchen brigade working a banquet production line
Costing8 min read

Hotel Kitchen Setup Cost Guide

How hotel kitchen budgets are structured across banquet, à la carte, bakery and support areas, and where they typically overrun.

Compact multi-brand cloud kitchen production area
Costing7 min read

Cloud Kitchen Setup Cost Guide

What it costs to equip a delivery-only kitchen, and why the economics differ sharply from a dine-in restaurant.

Want these numbers for your own project?